SALEM ENGINEERING NIGERIA LIMITED SERVICES

SALEM ENGINEERING NIGERIA LIMITED guarantees all major design and fabrication/assembly jobs carried out by it to be free of defects within a period of one (1) year. During this period, SALEM ENGINEERING NIGERIA LIMITED shall replace any faulty equipment in the assembled system at no cost to the client provided it is proven that such defects did not arise from inappropriate operation of the equipment on the part of the client. This therefore clearly shows the commitment of the company to job quality as defined in the company’s quality assurance manual.

Site survey and Engineering

Site survey and Engineering Validation of design deliverables

Commissioning and Maintenance

Commissioning and Maintenance of Complex Power Systems and Control Systems in Oil and Gas Plants

Oil & Gas

Oil and Gas Construction and Erection Works

Engineering

Preliminary Engineering

Procurement

Procurement

Electrical Power Systems

Electrical Power Systems and Instrumentations & Control for Utility Water Projects.

CHEVRON NIGERIA POWER SYSTEM UPGRADE PROJECT 33kV FEEDER FROM 33kV SWITCHYARD TO SIEMENS GIS 33kV HV FEEDER SWITCHEAR TO EVACUATION 7.5MVA SUB-STATION TRANSFORMER AND TO 11kVA DISTRIBUTION SWITCHGEAR TO 11kVA RING UNIT DISTRIBUTION SWITCHEAR - INSTALLED BY SALEM ENGINEERING